Summer 2019
Pickering Group, Memphis, TN
Description: After there was a fire in the 1969-era dimmer rack and the onstage counter weight rigging failed an inspection, UT-Martin realized that the stage equipment had to be replaced. The work was combined with the need for HVAC upgrades.
Back to Our Currently in Progress Back to Our Portfolio